Line Status: Active — 22:00 Operational Window

Your Program.Our Factory.On Spec.

Contract vehicle assembly running synchronized lines twenty-two hours a day — for OEM program managers, EV startups with a deadline, and tier-one suppliers when Q3 capacity maxes out.

Live Production Feed — Floor 1 & 2
Auto-refresh: 60s
0
Vehicles Completed
Units built YTD across all platforms
0.0
Defects Per Million
Rolling 12-month DPM rate
0
Simultaneous Platforms
Active OEM programs on floor
0.0M
Sq Ft Under Roof
Climate-controlled assembly space
All systems nominal — ISO/TS 16949 certified facility
Scroll
EV skateboard chassis on automated assembly line with robotic welding arms
Case 01 / EV Startup
Engagement 01 — 2024

Prototype to 12,000 Units.
Fourteen Months.

A California-based EV startup arrived with a validated skateboard chassis, a Series B term sheet, and a commitment to their first fleet customer — but no assembly infrastructure and eighteen months to SOP.

Torque stood up a dedicated line in our East Hall: tooling design, fixture fabrication, and operator qualification in parallel. We absorbed their contract engineering team on-site for the first ninety days, running concurrent station builds while the first pilot units moved through validation.

When the fleet customer accelerated delivery — cutting the window by four months — we added a second shift without a single change order to the base contract.

BEV PlatformGreenfield LineDual-ShiftFleet Delivery
Quantified Outcome
14mo

Prototype to 12,000-unit commercial run — four months ahead of revised customer SOP.

Engagement 02 — 2023

Full Platform Outsource
During Retooling Year.

A Detroit-based OEM needed to retool their primary assembly plant for an incoming platform refresh — a twelve-month window during which an existing mid-size SUV program had to continue uninterrupted for dealer network commitments totaling 31,000 units.

Torque mirrored the OEM's existing station layout within our West Hall, qualified to their internal audit standards in sixty days, and absorbed the full program team — including their resident quality engineers — on a co-employment basis for the duration.

The retooling completed on schedule. The program returned to the OEM's plant with zero warranty escalations attributable to the transition period.

Legacy ICE PlatformMirror Line Setup31K Annual VolumeOEM Audit Certified
Quantified Outcome
0

Warranty escalations from transition period — 31,000 units delivered on dealer network schedule.

Legacy automotive assembly line with workers installing SUV door panels and trim
Case 02 / Legacy OEM
Precision military vehicle chassis assembly in secure controlled facility with workers in safety gear
Case 03 / Defense
ITAR Registered Facility
Engagement 03 — 2025

ITAR-Compliant Assembly
Zero Compliance Events.

A prime defense contractor required a sub-assembly partner for a light tactical vehicle program — specifically, final drive and powertrain integration on a platform carrying ITAR-controlled components throughout the build sequence.

Torque completed ITAR registration and facility access controls within the program's qualification window. We partitioned a dedicated secure bay, implemented personnel access logging to DCSA standards, and trained a dedicated operator cell with program-specific NDAs and security clearance support.

Three production years in, the program has completed four DCSA facility reviews — all with zero findings. The contractor has since extended Torque's scope to include electronics integration on the follow-on platform.

ITAR RegisteredDCSA CompliantSecure BayLTV PlatformElectronics Integration
Quantified Outcome
4/4

DCSA facility reviews passed with zero findings across three production years.

Core Capabilities — Floor 1 & 2
01

Body-in-White

Structural assembly & welding

02

Powertrain Integration

ICE, BEV, PHEV platforms

03

Trim & Final

Stations 1–24 in-house

04

Quality Gate

100% end-of-line inspection

05

Logistics Sequencing

Just-in-time supplier sync

06

ITAR Assembly

Registered secure facility

ISO/TS 16949 Certified
ITAR Registered
OSHA VPP Star
AIAG MMOG/LE Level A
Primary Path — Qualified Engagement

Request Capacity Assessment

A Torque program manager will review your volume, platform category, and SOP window — and respond within one business day with a preliminary capacity confirmation or conflict advisory.

Response within one business day. No sales calls without consent.

Secondary Path — Early Stage

Plant Capabilities PDF

Twelve pages covering line specifications, quality system documentation, certifications, and program case summaries — formatted for internal business case presentations.

Line capacity by vehicle category and shift
Quality system: APQP, PPAP, control plan templates
Facility diagrams — Floor 1 & 2 station layout
ISO/TS 16949 & ITAR registration documentation
Program case summaries with outcome data

Direct Line

programs@torqueassembly.com+1 (313) 555-0192

Program inquiries — Detroit, MI